Table of Contents

20231118

Time

1400-2330

Attendance

Roy, Gabriel, Onkar,

Spaces Occupied

PHYS 401, 433C, Dome, Roof

Goals

  1. Replace BERG belts on GAM
  2. Continue motor/encoder testing
    1. Translating Stage & Mirror
    2. Primary Filter Wheel
    3. Guide-probe stage
  3. PICSARR Observations
  4. Seeing Sanity Check with C8 on roof
    1. Need to get C8 working with someone's laptop

Frame Table

Time Observed Source Name Filter Int Time [s] Mag (filter) RA [h] DEC [deg] Source Type Scope Purpose Notes
20231118T HD Open e.g., 3 1.25(V) 20 45 Star C8 Seeing 15.042 w/o ag
20231118T Jupiter Open e.g., 3 1.25(V) 20 45 Planet C8 Seeing 15.042 w/o ag

Log

  1. Gabriel and Roy went over GAM results from 20231115
  2. Unmounted and lifted rotating mirror so that it doesn't snag on mount
  3. OTHER THINGS
  4. Bill/Katie arrived and we did PICSARR stuff.

ToDo

Notes

Weather

Data