Table of Contents

20240206

Time

1630-

Attendance

Olivia, Tara(H), Onkar, Roy

Spaces Occupied

401, 433C, Dome

Goals

  1. PICSI2 imaging (astropol)
  2. Test relaxation time with hatch disrupted seeing
    1. Do this at end of night
  3. Move all metal in inbetween so it is clear for student workforce
  4. Move all loose screws to new organizer

Frame Table

Time Observed Source Name Filter Int Time [s] Mag (filter) RA [h] DEC [deg] Source Type Scope Purpose Notes
YYYYMMDDThhmm (HD/NGC/ETC) UVBRI e.g., 3 1.25(V) 20 45 Star Main Pointing 15.042 w/o ag

Log

  1. Avoiding using hatch, once at beginning and once at end for relaxation test
  2. did pointing and focusing
  3. slew to HD120565
  4. slew to jupiter
  5. slew back to HD120565
  6. slew to HD100696
  7. slew to HD31314
  8. skew to NGC 2301 for tracking 10 frames a minute apart
  9. slew to M35 10 frames a minute apart 500ms at tracking rate 15.011
  10. slew to M35 10 frames a minute apart 500ms at tracking rate 15.010
  11. put on PICSI try to connect instrument rotator does not connect after much power cycling and tears
  12. decide we must move on, connect rest of PICSI
  13. focus:2415.2
  14. slew to MKN 421 take 15 number of sequence each 16 exp for 1000ms
  15. slew to HD 2147 take 20 number of sequence each 16 exp for 100ms

ToDo

Notes

Weather

Data