This is an old revision of the document!
20231115
Time
1700-
Attendance
Aiden and Gabriel
Spaces Occupied
433c
Goals
Identify problems with GAM
Log
- Setting up GAM lift
- Connect GAM to GAM motor controller
- Connected 37 AMP connector to GAM
- Connected 14 pin AMP connector to GAM
- Ordered List Item