20240206
Time
1630-
Attendance
Olivia, Tara(H), Onkar, Roy
Spaces Occupied
401, 433C, Dome
Goals
- PICSI2 imaging (astropol)
- Test relaxation time with hatch disrupted seeing
- Do this at end of night
- Move all metal in inbetween so it is clear for student workforce
- Move all loose screws to new organizer
Frame Table
Time Observed | Source Name | Filter | Int Time [s] | Mag (filter) | RA [h] | DEC [deg] | Source Type | Scope | Purpose | Notes |
---|---|---|---|---|---|---|---|---|---|---|
YYYYMMDDThhmm | (HD/NGC/ETC) | UVBRI | e.g., 3 | 1.25(V) | 20 | 45 | Star | Main | Pointing | 15.042 w/o ag |
Log
- Avoiding using hatch, once at beginning and once at end for relaxation test
- did pointing and focusing
- slew to HD120565
- slew to jupiter
- slew back to HD120565
- slew to HD100696
- slew to HD31314
- skew to NGC 2301 for tracking 10 frames a minute apart
- slew to M35 10 frames a minute apart 500ms at tracking rate 15.011
- slew to M35 10 frames a minute apart 500ms at tracking rate 15.010
- put on PICSI try to connect instrument rotator does not connect after much power cycling and tears
- decide we must move on, connect rest of PICSI
- focus:2415.2
- slew to MKN 421 take 15 number of sequence each 16 exp for 1000ms
- slew to HD 2147 take 20 number of sequence each 16 exp for 100ms